Installation
Your Structure, Up and Plumb
DestNest offers professional installation of all prefabricated LGSF components — walls, floors, and roof framing. Our installation crews are trained specifically on cold-formed steel systems and work directly from the shop drawings produced for your project. There is no translation layer between the factory and the field.
Because every panel and cassette is pre-labelled and sequenced, our installation is fast, clean, and predictable. Builders and general contractors consistently report that a DestNest framing package takes a fraction of the time of conventional wood framing — without the waste, the weather delays, or the callbacks.
What installation includes:
Sill plate and anchor bolt layout verification prior to panel setting
Wall panel erection and temporary bracing
Floor cassette placement and permanent fastening
Roof framing installation (trusses or rafter system)
All structural connections per engineered drawings and P.Eng. stamp
Final plumb, level, and square verification before handoff
Our Installation Team
Four-person crews working with a full day on-site. Depending on project size, a complete residential framing package typically takes one to five days from first panel to framed-in structure.
We hand off a structure that is ready for your mechanical, electrical, and envelope trades — plumb, square, and built to the drawing. No surprises. No re-work.