October 27th,
2025
Prefabrication: Steel components are manufactured in a factory to exact specifications, allowing for faster on-site assembly and more precise construction.
Reduced Labor Needs: Prefabricated steel framing can often be installed by a smaller crew, which can be an advantage where labor is scarce.
Dimensional Stability: Steel does not warp or split due to moisture changes, which helps maintain consistent quality and allows for quicker interior finishing work.
Predictable Workflows: The precision of steel components means the work is more predictable, allowing for faster progress for subsequent trades like electricians and plumbers.
Factors That Influence the Overall Timeline
Design Complexity: More complex or custom home designs can extend the overall build time.
Permits and Site Preparation: Time is required for obtaining permits, preparing the site, and conducting inspections, which are part of the total project duration.
Interior and Finishing Work: Interior work, custom finishes, and specialty items can significantly increase the time needed after the frame is up.
Subcontractor and Vendor Coordination: The efficiency of managing subcontractors and sourcing materials from multiple vendors can impact the speed of the project.
Bad Weather: Adverse weather conditions can cause delays at any stage of construction.